Evaluation of Production runs for DOE BER Ultra High-Resolution project: These are unverified runs and should not be used for analysis without consultation with hi-res project members
CAM-SE
CAM SE Link to CAM SE diagnostics
T341 experiments
T341 F compset Link to Atm/Land only pre-industrial and AMIP diagnostics
T341 B1850 Link to fully coupled pre-industrial run diagnostics
T85 experiments
T85 BTRANS Link to Fully Coupled "Present day" production run diagnostics in the CCSM4
T85 B1850 Link to Fully Coupled Pre-Industrial production run diagnostics in the CCSM4
T85 FAMIP Link to Atm/Land only 'AMIP' production run diagnostics in the CCSM4
T85 F1850 Link to Atm/Land only Pre-Industrial production run diagnostics in the CCSM4
Diagnostics for T85 manuscript
T85 FAMIP and B1850 diagnostics These will be specified when they are complete. For now, scroll down then website to find what you need.
FV 1degree F1850 run as above with traditional tunings to produce a balanced model
For Additional Information:
Marcia Branstetter
1 Bethel Valley Road
P.O. Box 2008, MS 6301
Bldg. 2040, E251
Oak Ridge, Tennessee 37831
Phone: (865) 574-0813
Email: branstetterm at ornl dot gov